Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 88: 2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION
Project Number:
Title:
Upper Columbia Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 20.00%
Methow 40.00%
Wenatchee 40.00%
Contract Number:
56662 REL 88
Contract Title:
2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION
Contract Continuation:
Previous: Next:
56662 REL 65: 2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION
  • 56662 REL 119: 2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
This contract will fund the Yakama Nation's, Upper Columbia Habitat Restoration Project to seek, design and implement fish habitat restoration projects throughout the Methow, Entiat, and Wenatchee subbasins for the FY 2016 performance period.
Account Type(s):
Expense
Contract Start Date:
10/01/2015
Contract End Date:
12/31/2016
Current Contract Value:
$1,918,966
Expenditures:
$1,918,966

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shannon Adams Yakama Confederated Tribes No Technical Contact adas@yakamafish-nsn.gov (509) 945-0754
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Jason Breidert Yakama Confederated Tribes Yes Technical Contact brej@yakamafish-nsn.gov (509) 860-5351
Chris Butler Yakama Confederated Tribes Yes Technical Contact butlerc@yakamafish-nsn.gov (509) 449-8215
Christopher Clemons Yakama Confederated Tribes Yes Technical Contact clec@yakamafish-nsn.gov (509) 881-5746
Madeleine Eckmann Yakama Confederated Tribes Yes Technical Contact eckm@yakamafish-nsn.gov (509) 449-2091
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Jarred Johnson Yakama Confederated Tribes Yes Technical Contact johj@yakamafish-nsn.gov (509) 881-1462
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jackie Olney Yakama Confederated Tribes Yes Administrative Contact olnj@yakamafish-nsn.gov (509) 865-5121x6313
Steve Parker Yakama Confederated Tribes No Supervisor pars@yakamafish-nsn.gov (509) 865-6262x6342
Brandon Rogers Yakama Confederated Tribes Yes Supervisor rogb@yakamafish-nsn.gov (509) 949-4109
Hans Smith Yakama Confederated Tribes Yes Contract Manager h.smith@methownet.com (509) 449-2750
Matt Wilberding Yakama Confederated Tribes Yes Technical Contact wilm@yakamafish-nsn.gov (509) 881-7091


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All administrative tasks fulfilled with timely quality products A: 119. Perform project management and administrative duties 12/31/2016 12/28/2016
Assist BPA in producing Environmental Compliance documents B: 165. Environmental Compliance 12/31/2016 12/28/2016
Complete the USFS NEPA process for the Stormy Project Area A in the Entiat Watershed F: 165. Entiat Stormy A USFS NEPA Process 2014-125 11/15/2016 12/13/2016
NEPA analysis and documentation to obtain permits for the Upper Stillwaters projects G: 165. Entiat Upper Stillwaters USFS NEPA Process 2013-109 11/15/2016 12/13/2016
Chewuch RM15.5-20 EC process H: 165. Chewuch RM15.5-20 Phase 1 USFS EA development-NEPA 2015-142 12/31/2016 12/28/2016
Lower Wenatchee Public Outreach I: 99. Lower Wenatchee Public Outreach - 2012-98 12/30/2016 12/13/2016
Lower Wenatchee River Reach Assessment Report, uploaded to Pisces J: 115. Lower Wenatchee Reach Assessment 2014-121 12/30/2016 12/28/2013
8-Mile Creek Fish Barrier Removal Design K: 175. 8-Mile Creek Fish Barrier Removal Design 2015-141 12/31/2016 12/28/2016
Draft conceptual designs and report, uploaded to Pisces L: 175. Chewuch RM17-20 Fish Enhancement Project Survey 2015-140 11/01/2016 11/01/2016
Draft and Final Construction Plans M: 175. Chewuch RM 15.5-17 Fish Enhancement Project Engineering 2012-97 12/31/2016 12/28/2016
Construction Management & Monitoring Plan Complete Q: 100. LWP Groups 2&3 Habitat Restoration Construction Oversight-2012-99 12/31/2016 12/13/2016
Implement Groups 2&3 LWP Habitat Restoration project R: 30. LWP Groups 2&3 Habitat Restoration Construction-2012-99 12/16/2016 12/13/2016
Final Design Set and Monitoring Plan Z: 175. Twisp Ponds Left Bank Side Channel Design 2010-54 07/01/2016 06/30/2016
Bidding Assistance and Construction Management AA: 100. Twisp Ponds Left Bank Side Channel Construction Management 2010-54 12/31/2016 12/28/2016
1,000 feet of side channel created AB: 30. Twisp Ponds Left Bank Side Channel Construction 2010-54 11/01/2016 09/30/2016
Final Design Set and Monitoring Plan AC: 175. Twisp Horseshoe Side Channel Design (RM 11.5) 2010-39 12/31/2016
Final Design Set and Monitoring Plan AF: 175. Early Winters Creek - Twenty Below Engineering 2014-117 12/31/2016
Construction Management and Monitoring Plan AI: 100. Newby Narrows Fish Habitat Enhancement Project Construction Oversight 2015-153 12/31/2016
Improve channel structure and complexity to 5,000 linear feet of the Twisp River AJ: 29. Newby Narrows Fish Habitat Enhancement Project Construction 2015-153 12/31/2016
Final Construction Plan and Monitoring Plan (Including As-Builts) AM: 175. Entiat 3-D LWM Revisited Design Engineering 2009-29 09/30/2016
NEPA analysis and documentation to obtain permits for Upper Wenatchee projects AP: 165. CCR-36111/Mod. 1 Upper Wenatchee USFS NEPA Process 2015-145 12/30/2016
River Safety Assessment Reports, uploaded to Pisces AQ: 174. CCR-36111/Mod. 1 UC River Safety Assessments (2016) 2011-61 12/31/2016 12/28/2016
Beaver Creek Reach Assessment Report and Data, uploaded to Pisces AR: 115. CCR-36111/Mod. 1 Beaver Creek Reach Assessment 2015-154 12/31/2016
Final Construction Plan AS: 175. CCR-36111/Mod. 1 Newby Narrows Design Phase 4 2015-153 01/30/2016 01/30/2016
Skinney creek design through phase 2 AT: 175. CCR-36111/Mod. 1 Skinney Creek Design 2015-144 12/30/2016 12/13/2016
Confidential Water Rights Evaluation AU: 154. CCR-36111/Mod. 1 Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 12/31/2016
Produce Detailed Restoration Plans Suitable for Permitting AZ: 175. CCR-36111/Mod. 1 Twisp River - Scaffold Camp Restoration Engineering 2015-146 12/31/2016
Produce Detailed Restoration Plans Suitable for Permitting BA: 175. CCR-36111/Mod. 1 Twisp River - Horseshoe PHASE 2 Restoration Engineering 2010-39 12/31/2016
Produce Detailed Restoration Plans Suitable for Permitting and Construction Bidding BB: 175. CCR-36111/Mod. 1 Twisp River - War Creek Restoration Engineering 2015-148 12/31/2016
Plant Native Woody Vegetation and Install Deer Exclusion Fencing BC: 47. CCR-36111/Mod. 1 Twisp Ponds Left Bank Riparian Restoration 2010-54 12/31/2016 10/31/2016
Produce Detailed Restoration Plans Suitable for Permitting BD: 175. CCR-36111/Mod. 1 Upper Methow Fawn Creek Design 2015-147 12/31/2016
Produce Detailed Restoration Plans Suitable for Permitting BE: 175. CCR-36111/Mod. 1 Methow River (M2) - WDFW Floodplain Groundwater Gallery Design 2016-155 12/31/2016
Implement Groups 2&3 LWP Habitat Restoration project BF: 29. LWP Groups 2&3 Habitat Restoration Construction-2012-99 (CCR-36111/Mod. 1) 12/16/2016 12/13/2016
Produce Detailed Restoration Plans Suitable for Permitting and Construction Bidding BG: 175. CCR-37158/Mod. 2 Peshastin RM 2.7 Design 2016-160 12/31/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 8 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 5 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 19 instances of WE 175 Produce Design
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 11 instances of WE 100 Construction Management
Coho (O. kisutch) - Unspecified Population
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 7 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 5 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 17 instances of WE 175 Produce Design
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 10 instances of WE 100 Construction Management
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 3 instances of WE 175 Produce Design
  • 2 instances of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Perform project management and administrative duties 10/01/2015
B 165 Environmental Compliance 10/01/2015
C 185 Periodic Status Reports for BPA 10/01/2015
D 132 2015 Annual Progress Report (submitted via other contract) 10/01/2015
E 132 2016 Annual Progress Report (submitted via other contract) 10/01/2015
F 165 Entiat Stormy A USFS NEPA Process 2014-125 10/01/2015
G 165 Entiat Upper Stillwaters USFS NEPA Process 2013-109 10/01/2015
H 165 Chewuch RM15.5-20 Phase 1 USFS EA development-NEPA 2015-142 10/01/2015
I 99 Lower Wenatchee Public Outreach - 2012-98 10/01/2015
J 115 Lower Wenatchee Reach Assessment 2014-121 10/01/2015
K 175 8-Mile Creek Fish Barrier Removal Design 2015-141 10/01/2015
L 175 Chewuch RM17-20 Fish Enhancement Project Survey 2015-140 06/02/2016
M 175 Chewuch RM 15.5-17 Fish Enhancement Project Engineering 2012-97 06/02/2016
N 175 Meacham Flats Habitat Restoration Engineering - 2012-102 05/10/2016
O 100 Meacham Flats Habitat Restoration Construction Oversight - 2012-102 10/01/2015
P 30 Meacham Flats Habitat Restoration Construction 2015-127
Q 100 LWP Groups 2&3 Habitat Restoration Construction Oversight-2012-99 10/01/2015
R 30 LWP Groups 2&3 Habitat Restoration Construction-2012-99 04/01/2016
S 175 Signal Peak Habitat Restoration Design Engineering 2013-108 06/02/2016
T 100 Signal Peak Habitat Restoration Construction Management 2013-108 10/01/2015
U 30 Signal Peak Side-Channel Construction 2013-108
V 29 Signal Peak Rip-Rap Enhancement Sites A & B Construction 2013-108
W 175 Upper Burns Habitat Restoration Design Engineering 2013-107 10/01/2015
X 100 Upper Burns Habitat Restoration Design Construction Management 2013-107 10/01/2015
Y 29 Upper Burns Rip-Rap Enhancement Construction 2013-107
Z 175 Twisp Ponds Left Bank Side Channel Design 2010-54 03/16/2016
AA 100 Twisp Ponds Left Bank Side Channel Construction Management 2010-54 10/01/2015
AB 30 Twisp Ponds Left Bank Side Channel Construction 2010-54 06/15/2016
AC 175 Twisp Horseshoe Side Channel Design (RM 11.5) 2010-39 10/01/2015
AD 100 Twisp Horseshoe Side Channel Construction Management (RM 11.5) 2010-39 10/01/2015
AE 30 Twisp Horseshoe Side Channel Construction (RM 11.5) 2010-39
AF 175 Early Winters Creek - Twenty Below Engineering 2014-117 12/31/2016
AG 100 Early Winters Creek - Twenty Below Construction Management 2014-117 10/01/2015
AH 29 Early Winters Creek - Twenty Below Construction 2014-117
AI 100 Newby Narrows Fish Habitat Enhancement Project Construction Oversight 2015-153 10/01/2015
AJ 29 Newby Narrows Fish Habitat Enhancement Project Construction 2015-153 07/01/2016
AK 100 Lower Twisp Large Wood Enhancement Project Construction Oversight 2015-127 10/01/2015
AL 29 Lower Twisp Large Wood Enhancement Project Construction 2015-127
AM 175 Entiat 3-D LWM Revisited Design Engineering 2009-29 02/05/2016
AN 100 Entiat 3-D LWM Revisited Construction Management 2009-29 10/01/2015
AO 29 Entiat 3-D LWM Revisited Habitat Enhancement Project Construction 2009-29
AP 165 CCR-36111/Mod. 1 Upper Wenatchee USFS NEPA Process 2015-145 10/01/2015
AQ 174 CCR-36111/Mod. 1 UC River Safety Assessments (2016) 2011-61 10/01/2015
AR 115 CCR-36111/Mod. 1 Beaver Creek Reach Assessment 2015-154 03/16/2016
AS 175 CCR-36111/Mod. 1 Newby Narrows Design Phase 4 2015-153 03/16/2016
AT 175 CCR-36111/Mod. 1 Skinney Creek Design 2015-144 10/01/2015
AU 154 CCR-36111/Mod. 1 Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 10/01/2015
AV 175 CCR-36111/Mod. 1 Methow Basin EWD Instream Flow Project - Eng. Feasibility Assessment 2015-152
AW 100 CCR-36111/Mod. 1 Big Valley South Construction Oversight 2012-101 10/01/2015
AX 29 CCR-36111/Mod. 1 Big Valley South Habitat Complexity 2012-101
AY 180 CCR-36111/Mod. 1 Big Valley South Structure Removal 2012-101
AZ 175 CCR-36111/Mod. 1 Twisp River - Scaffold Camp Restoration Engineering 2015-146 10/01/2015
BA 175 CCR-36111/Mod. 1 Twisp River - Horseshoe PHASE 2 Restoration Engineering 2010-39 10/01/2015
BB 175 CCR-36111/Mod. 1 Twisp River - War Creek Restoration Engineering 2015-148 10/01/2015
BC 47 CCR-36111/Mod. 1 Twisp Ponds Left Bank Riparian Restoration 2010-54 06/15/2016
BD 175 CCR-36111/Mod. 1 Upper Methow Fawn Creek Design 2015-147 10/01/2015
BE 175 CCR-36111/Mod. 1 Methow River (M2) - WDFW Floodplain Groundwater Gallery Design 2016-155 10/01/2015
BF 29 LWP Groups 2&3 Habitat Restoration Construction-2012-99 (CCR-36111/Mod. 1) 08/17/2016
BG 175 CCR-37158/Mod. 2 Peshastin RM 2.7 Design 2016-160 10/01/2015